Current Status of Medical Waste Incinerator Use in Kenya’s County-Level Healthcare Facilities Market Analysis 1. Decentralized Healthcare Expansion Following Kenya’s 2010 constitutional devolution, healthcare responsibilities shifted significantly to county governments. […]
incinerator small to medium waste dispossal
Carburant Diesel Capacité (M3) 1.92 Ave Capacity 1200kg Consommation (litre/heure 12 Dimension externes Longueur (mm) 3110 Largeur (mm) 2150 Hauteur (mm) 3200 Ouverture Porte 1000×2000 Dimension internes Longueur (mm) 2200 […]
Reliable Waste Management in Somalia
Reliable Waste Management in Somalia: HICLOVER Incinerators Supporting UN & AU Camps for Over a Decade In the heart of East Africa’s most challenging operational environments, HICLOVER has stood as […]
20-30kgs of waste per hour with water scrubber
Item Specification Model YD-30C (customer made model) Main Product List Primary Combustion Chamber(Main body stainless steel) Secondary Combustion Chamber(Main body stainless steel) Mix-Combustion Chamber Wet Scrubber( Washing Tower)(Main body stainless […]
Medical Waste Disposal in Kenya’s Loitokitok Sub-County Hospital
Medical Waste Incinerator with Gas Scrubber Installed at Loitokitok Sub-County Hospital, Kenya | HICLOVER Leads Healthcare Waste Solutions in East Africa HICLOVER Incinerators Empowering Safe Medical Waste Disposal in Kenya’s […]
Animal incinerator for pig farm Average 100 kgs per hour
Model A1500 (customer made model) Internal Dimensions 150 x 100 x 96cm Suit for Animal Cat – yes Dog – yes Pig – yes Cow – no Main Product List […]
Sudan Medical waste Treatment Scheme
• A burn rate of 25 – 30kg/hr. • Consists of two chambers to ensure significant reduction of emissions and be capable of temperatures in the range of 800-1000˚c. • […]
A MOBILE MEDICAL WASTE INCINERATORS
Main Product List Primary Combustion Chamber Secondary Combustion Chamber Mix-Combustion Chamber Smoke Filter Chamber Incinerator Control Case Chimney:5.0Meters *(upgrade to Stainless Steel, free cost) Italy oil burner: 02 sets Oil […]
Afterburner Preheat Incinerator
PRIMARY CHAMBER Heavy-duty steel casing High quality refractory lining and insulation Large full size top load counterbalanced door 1 x oil/gas fired ignition burners operated on/off SECONDARY CHAMBER Heavy-duty steel […]
Incinerator YD-500 for Vietnam
We finish this project in year 2010 to 2011 and delivery to Hochiminh port, Vietnam with 1×40’feet open top full container. Items/Model YD-500 Burning Rate (kgs/Hour) 500 kgs/Hr. Feed Capacity […]