Skip to content
  • Home
  • Blog
  • News
  • RFQ

HICLOVER

Waste Incinerator for COVID19

HICLOVER

Waste Incinerator for COVID19

  • Home
  • Blog
  • News
  • RFQ
February 16, 2019 ctwai

Contractor for design, installation and commissioning of an incinerator

Contractor for design, installation and commissioning of an incinerator

The appointment of a contractor for the design, installation and commissioning of an incinerator at the Pretoria National Zoological Garden. Minimum …
Tagged blogger

Post navigation

Previous: What’s Main Feature of Model A600 Pet Animal Incinerator
Next: Where trash will end up is uncertain
© 2025 HICLOVER. Proudly powered by Botiga